Acacia Ridge | Choccie to Chiller

We recently took on a unique project, transforming a former chocolate storage room into a fully functioning chiller.

This project required careful planning and execution across two main stages:

The removal of outdated high temperature equipment and the installation of new medium temperature refrigeration systems, electrical upgrades and supporting infrastructure.

[project spotlight]

ACACIA RIDGE |
CHOCCIE TO CHILLER

We recently took on a unique project,
transforming a former chocolate storage room into a fully functioning chiller.

This project required careful planning and execution across two main stages:

The removal of outdated high temperature equipment and the installation of new medium temperature refrigeration systems, electrical upgrades and supporting infrastructure.

Scope of work completed:

Stage 1: Removal

  • Pumped down and isolated existing refrigeration.
  • Disconnected and removed all pipework, electrics and equipment.

Stage 2: Installation

  • Upgraded power circuit to 60 amps.

  • Installed new refrigeration control board.

  • Supplied and fitted medium temperature refrigeration equipment in existing locations.

  • Installed new pipework, drain lines with P-traps and electrical connections.

  • Pressure tested, evacuated and charged refrigerant with R448.

  • Ran final tests and commissioned the system.

The result?

The “Choccie to Chiller” project delivered a reliable, efficient cooling system ready for long term performance. By modernising the power, pipework and equipment, we ensured the space is perfectly equipped to operate as a high performance chiller room.

This project is another example of Allfrige Solutions’ capability to delivery high quality commercial upgrades from concept to completion.